Which of the following is a type of non-functional testing?
![]()
Practice ISTQB Foundation Level Q&A – Which of the following is a type of non-functional testing?
![]()
Practice ISTQB Foundation Level Q&A – Which of the following is a type of non-functional testing?
![]()
Practice ISTQB Foundation Level Q&A – Which of the following are false?
![]()
Practice ISTQB Foundation Level Q&A – Software quality is not relevant to …
![]()
Practice ISTQB Foundation Level Q&A – Testing is not done to ….
![]()
Practice ISTQB Foundation Level Q&A – Which of the following provides the biggest potential cost saving from use of CAST?
![]()
Practice ISTQB Foundation Level Q&A – Amount of testing performed will not depend on
![]()
Practice ISTQB Foundation Level Q&A – A piece of software has been given….what tests in the Following will you perform?
1) Test the areas most critical to business processes
2) Test the areas where faults will be maximum
3) Test the easiest functionalities
![]()
Practice ISTQB Foundation Level Q&A – Which of the following is not included in Test Plan ?
![]()
Practice ISTQB Foundation Level Q&A – Which tool will be used to test the flag memory leaks and unassigned pointers
![]()
Practice ISTQB Foundation Level Q&A – What type of testing will you perform on internet banking solution?
![]()
Practice ISTQB Foundation Level Q&A – Cost of the reviews will not include.
![]()
Practice ISTQB Foundation Level Q&A – Match the following.
1. Configuration identification
2. Configuration control
3. Status reporting
4. Configuration auditing
(a). Maintains of CI’s in a library
(b). Checks on the contents of the library
(c). Function recording and tracking problems.
(d). Requires the all CI’s and their versions in the system are known
![]()
Practice ISTQB Foundation Level Q&A – Exclusive use of white box testing in a test-phase will:
![]()
Practice ISTQB Foundation Level Q&A – One of the following is not a part of white box testing as per BS7925-II standards.
![]()
Practice ISTQB Foundation Level Q&A – Match the following:
(1). Test estimation
(2). Test control
(3). Test monitoring
(a)measures of tracking process
(b) effort required to perform activities
(c) reallocation of resources