Time and Work Questions and Answers With Explanation

Loading

Time and Work Questions and Answers With Explanation

  1. Two men A and B working together complete a piece of work which it would have ta
  2. Vijay can do a piece of work in 1/3rd of the time taken by Ajay. If b
  3. There are 6 tasks and 6 persons. Task 1 cannot be assigned either to person 1 or
  4. If 5 persons can do 5 times of a work in 5 days, then 10 persons can do 10 times
  5. Two workers A and B were employed for a work. A takes 8 hour more than the time
  6. Ram and Shyam together do a work in 8 days. Both of them began to work. After 3
  7. A takes thrice as long to do a piece of work, as B takes. A and B together can d
  8. If 33 untrained labourers can do a work in 15 days of 12 hr. each, how many trai
  9. 16 men complete one-fourth of a piece of work in 12 days. What is the additional
  10. A and B can do a work in 12 days, B and C in 15 days, C and A in 20 days. If A,
  11. Ronald and Elan are working on an assignment. Ronald takes 6 hours to type 32 pa
  12. Some persons can do a piece of work in 12 days. Two times the number of such per
  13. 39 persons can repair a road in 12 days, working 5 hours a day. In how many days
  14. 36 men can complete a piece of work in 18 days. In how many days will 27 men com
  15. A, B and C together can complete a piece of work in 10 days. All the three start
  16. Rahul can finish one-fifth of his homework in one hour. Neha can finish three-se
  17. Jagdish can build a wall in 10 days. Narender can build the same wall in 12 days
  18. A content manager is working on an excel sheet. She has 6 columns in the sheet –
  19. If a task is to be completed in 10 days, 10 men or 12 women should be employed.
  20. Harish and Peter working separately can paint a building in 18 days and 24 days
  21. 5 Women can paint a building in 30 working hours. After 16 hours work, 2 women d
  22. A can complete a piece of work in 4 days. B takes double the time taken by A, C
  23. 3 boys can complete a work in 7 days. 1 boy can complete it in:
  24. If 30 men working 7 hours a day can do a piece of work in 18 days. In how many d
  25. Agyan is twice as good a workman as Adroit. If they work together, a task is acc
  26. A cheetah runs at a speed of 144 kmph. It covers a distance of 280 m in:
  27. If 24 men working 7 hours a day can do a piece of work in 18 days. In how many d
  28. 3 boys can complete a work in 9 days. 1 boy can complete it in:
  29. 4 boys can complete a work in 17 days. 1 boy can complete it in:
  30. Two computers each produced 48000 public utility bills in a day. One computer pr
  31. A computer printer produced 176,400 lines in a given day. If the printer was in
  32. A and B together can do a piece of work in 6 days and A alone can do it in 9 day
  33. During a given week A programmer spends 1/4 of his time preparing flow chart, 3/
  34. Ram and Shyam are quizmasters. The time taken by Ram and make a question is doub
  35. A man engaged a servant on a conditionn that he will pay Rs 90 and also give him
  36. A is twice as efficient as B and B is thrice as efficient as C, who can finish a
  37. There is a work which can be completed by A with 12 days and B by 18 days. A and
  38. On planet Korba, a solar blast has melted the ice caps on its equator. 9 years a
  39. Mr. Alex is the father of children Jane, Joe, and Jill. He goes to a nearby park
  40. George can do some work in 8 hours. Paul can do the same work in 10 hours while
  41. A and B completed a work together in 5 days. Had A worked at twice his own speed
  42. P is five times as efficient as Q in respect of doing work. Together, they compl
  43. I was supposed to complete a task in 12 h, but I took more time and the error wa
  44. A,B and C can together do some work in 72 days.A and B together do two times as
  45. A can finish a piece of work in 48 days. B is twice as efficient as A. A started
  46. In a computer game, a builder can build a wall in ten hours while a destroyer ca
  47. A can complete a given task in 24 days, while B is twice as efficient as him. A
  48. Manu working alone on a job takes 12 days more than what he would have taken if
  49. A and B together can do a work in 8 days, B and C together in 6 days, while C an
  50. If A alone can do a piece of work in 8 days and B alone can do the same work in
  51. Two boys and a girl can do a work in 5 days, while a boy and 2 girls can do it i
  52. A person can complete a job in 120 days. He works alone on Day 1. On Day 2, he i
  53. A company contracts to paint 3 houses. Mr.Brown can paint a house in 6 days whil
  54. Two guys work at some speed. After some time one guy realises he has done only
  55. To finish a piece of work, P takes Five times as Q and six times as R. Working t
  56. Rishab starts for a weeding venue at 6:00 pm and drives at a speed of 60km/hr. R
  57. If 20 men or 24 women or 40 boys can do a job in 12 days working for 8 hours a d
  58. A printer can print 17000 billing statements in an hour .one day, the printer be
  59. A printer started its work at 8.15 a.m. and ended its work at 9.20 p.m. It was i
  60. If 20 men take 30 days to complete a job. In how many days can 25 men complete t
  61. Sixteen men complete a work in 24 days while 48 children can do it in 16 days. T
  62. One man, 3 women and 4 boys can do a piece of work in 96 hours, 2 men and 8 boys
  63. A can do a certain work in 12 days. B is 60% more efficient than A. How many day
  64. A and B together can complete a work in 12 days. A alone can complete it in 20 d
  65. A and B can do a piece of work in 12 days. B and C can do it the same work in 20
  66. A is twice as good a workman as B and together they finish a piece of work in 18
  67. X alone can do a piece of work in 15 days and Y alone can do it in 10 days. X an
  68. 9 laboures can complete the construction of a wall in 18 days. How many less day
  69. A is twice as good a workman as B and is therefore able to finish a piece of wor
  70. An air conditioner can cool the hall in 40 miutes while another takes 45 minutes
  71. A can do a piece of work in 10 days, B in 15 days. They work together for 5 days
  72. The average age of A and B is 20 years. If C replace A the average would be 19 a
  73. A and B can do a piece of work in 12 days, B and C can do it in 15 days and C an
  74. In boring a well 50 m deep, the cost is Rs.4/- for the first meter. The cost of
  75. A can do a piece of work in 9 days. B can do the same in 12 days. In how many da
  76. If A and B can do a piece of work in 10 days and A alone can do it in 15 days, h
  77. If 5 men take an hour to dig a ditch, then how long should 12 men take a dig to
  78. A man can complete a job in 12 days, his wife will complete in 15 days. How many
  79. Sixteen men can complete a work in twelve days. Twenty four children can complet
  80. 12 men can complete a piece of work in 4 days, while 15 women can complete the s
  81. A make a wall in 9 hour. B makes a wall in 10 hour. When doing together 10 more
  82. A man and a woman, walking together start out by both taking a step with the lef
  83. A and B together can do a piece of work in 12 days and A alone can complete the
  84. If a man earns Rs20 on first day and spends Rs15 on second day, and earns Rs20 o
  85. There are 3 boys and 4 girls. How many ways they are arranged such that boys sho
  86. If 8 men and 6 boys can dig a well in 2 days, and 6 men and 2 boys can do it in
  87. if 12 men working 2 hours a day take 10 days to complete a job, how long will 8
  88. A and B are partners in a business. A contributes 1/4 of the capital for 15 mont
  89. A man starts from B to K, another starts from K to B, at the same time. After pa
  90. Ravi and Kumar are working on an assignment. Ravi takes 6 hours to type 32 pages
  91. If 18 persons can build a wall 140 m long in 42 days, the number of days that 30
  92. A is two years older than B who is twice as old as C. If the total of the ages o
  93. A is 30% more efficient than B. How much time will they, working together, take
  94. X can do a piece of work in 40 days. He works at it for 8 days and then Y finish
  95. X and Y can do a piece of work in 20 days and 12 days respectively. X started th
  96. Two men X and Y started working for a certain company at similar jobs on January
  97. Twenty women can do a work in sixteen days. Sixteen men can complete the same wo
  98. Rajiv can do a piece of work in 10 days , Venky in 12 days and Ravi in 15 days.
  99. If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys c
  100. A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how man
  101. A works twice as fast as B. If B can complete a work in 12 days independently, t
  102. A takes twice as much time as B or thrice as much time as C to finish a piece of
  103. A man has a job, which requires him to work 8 straight days and rest on the nint
  104. A machine P can print one lakh books in 8 hours, machine Q can print the same nu
  105. A is thrice as good as workman as B and therefore is able to finish a job in 60
  106. A finishes 6/7th of the work in2z hours, B works twice as fast and finishes the
  107. A does 80% of a work in 20 days. He then calls in B and they together finish the
  108. A can lay railway track between two given stations in 16 days and B can do the s
  109. A can finish a work in 24 days, B in 9 days and C in 12 days. B and C start the
  110. A can finish a work in 18 days and B can do the same work in 15 days. B worked f
  111. A can do a work in 15 days and B in 20 days. If they work on it together for 4 d
  112. A can do a piece of work in 4 hours B and C together can do it in 3 hours, while
  113. A and B walk around a circular track. They start at 8 a.m. from the same point i
  114. A and B together can do a piece of work in 30 days. A having worked for 16 days,
  115. A and B can together finish a work 30 days. They worked together for 20 days and
  116. A and B can do a work in 8 days, B and C can do the same work in 12 days. A, B a
  117. A and B can do a piece of work in 30 days, while B and C can do the same work in
  118. A and B can do a job together in 7 days. A is 7/4 times as efficient as B. The s
  119. A and B can complete a work in 15 days and 10 days respectively. They started do
  120. A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertoo
  121. 4 men and 6 women can complete a work in 8 days, while 3 men and 7 women can com
  122. 10 women can complete a work in 7 days and 10 children take 14 days to complete
  123. 10 men working 6 hrs per day manufacture 200 shoes in 18 days. How many hours a
  124. Average of 10 two digit positive integer is Z. However, one number AB is taken a
  125. Which of the following numbers must be added to 5678 to give a reminder 35 when
  126. Two pipes A and B can fill a tank in 24 hours and 
  127. A and B together can do a piece of work in 40 days. A having worked for 20 days,
  128. In a public bathroom there are n taps 1,2,3…n. Tap1 and Tap2 take equal time t
  129. A and B can do a work in 4 hours and 12 hours respectively. A starts the work at
  130. Amit can do a piece of work in 45 days, but Bharath can do the same work in 5 da
  131. (x-2) men can do a piece of work in x days and (x+7) men can do 75% of the same
  132. A, B and C can complete a piece of work in 24,6 and 12 days respectively.Working
  133. When A, B and C are deployed for a task , A and B together do 70% of the work an
  134. A works twice as fast as B.If  B can complete a work in 18 days independent
  135. A can do a certain work in the same time in which B and C together can do it.If
  136. 12 men can complete a work in 8 days. 16 women can complete the same work in 12
  137. Four pipes A,B, C and D can fill a cistern  in 20,25, 40 and 50 hours respe
  138. A is thrice efficient as B and C is twice as efficient as B. what is the ratio o
  139. P can complete a work in 12 days working 8 hours a day.Q can complete the same w
  140. A, B and C can do a piece of work in 24 days, 30 days and 40 days respectively.
  141. A can finish a work in 15 days and B can do the same work in 12 days . B worked
  142. A and B together finish a wor in 20 days.They worked together for 15 days and th
  143. Ten women can do a work in six days. Six men can complete the same work in five
  144. A and  B can do  a piece of work in 30 days , while  B and C can
  145. A is twice efficient as B and together they do the same work in as much time as
  146. Kaushalya can do a work in 20 days, while kaikeyi can do the same work in 25 day
  147. There are three boats B1, B2 and B3 working together they carry 60 people in eac
  148. At Arihant Prakasham every book goes hrough 3 phases (or stages) typing, composi
  149. A single reservoir supplies the petrol to the whole city, while the reservoir is
  150. The ratio of efficiency of A is to C is 5:3. The ratio of number of days taken b
  151. A Contractor employed a certain number of workers  to finish constructing a
  152. Pipe A can fill the tank in 4 hours,while pipe B can fill it in 6 hours working
  153. A contractor  undertook a project to complete it in 20 days which needed 5
  154. A tank has an inlet and outlet pipe. The inlet pipe fills the tank completely in
  155. Mr. stenley employed a certain number of typist for his project. 8 days later 20
  156. A group of workers was put on a job. From the second day onwards, one worker was
  157. A can do a piece of work in 10 days, B in 15 days. They work together for 5 days

Leave a Comment